The only company in Uzbekistan engaged in the installation of overhead power lines (OPL) in remote and mountainous areas

Expertise in the construction of energy infrastructure

About the company

JSC “Maksus Elektr Tarmoq Qurilish” is a specialized construction and installation company with extensive experience in the construction of electric power facilities. The company has been operating since 1995, serving as the legal successor to a specialized division established on the basis of the Sredazelektrosetstroy Trust of the USSR Ministry of Energy, which had been constructing power lines and substations in Central Asia and Kazakhstan since 1963.

Over the years, the company has developed the necessary production and technical infrastructure to handle complex infrastructure projects, accumulated significant industry experience, and ensured a high level of personnel training. Operations are conducted through its head office in Tashkent and a system of mobile production sites, enabling it to effectively implement projects in various regions of the Republic of Uzbekistan.

The company operates a modern fleet of construction equipment and specialized vehicles, as well as a team of qualified specialists—high-rise assemblers, machine operators, and drilling and blasting experts. This approach ensures consistent quality and reliability of its work, allowing the company to maintain a leading position in the high-voltage transmission line construction sector in Uzbekistan.

30 years of experience

We have been working in the energy construction market since 1995

110-500 кВ

Construction and reconstruction of high-voltage power lines and substations

5 production sites

Mobilized areas in different regions of Uzbekistan

158.5 billion soums

Volume of completed construction and installation works since 2010

METQ Services

  • All
  • Completed projects
  • Ongoing projects

150MW/300MWh Battery Energy Storage System Project in Fergana, Uzbekistan | Electrical and Installation Works

The BESS Uzbekistan project is located in the city of Yapyan, Fergana region, and was successfully completed by the UET Construction company in late 2024 – early 2025. It provides stabilization of the energy network and management of peak loads in the Fergana Valley.

Project of the new Argande 500/200/20 kV substation (200 km)

In Kabul, Afghanistan, UET Construction (an EPC contractor) is constructing the Argande 500/200/20 kV substation (200 km). Working with the Ministry of Energy of the Republic of Uzbekistan, the project is being implemented from design to electrical installation.

Project of double-circuit overhead line 500 kV Karakul-Nurabad (260 km)

In Uzbekistan, UET Construction (an EPC contractor) is building a 500 kV double-circuit power line from Karakul to Nurabad (260 km) for the National Electric Grid. The scope of work includes design, procurement, and all phases of construction.

Project of the Sazagan substation and the 500 kV overhead line Khalkha-Sazagan, with a length of 200 km

In Uzbekistan, UET Construction, as a subcontractor to ACWA POWER and L&T, is constructing the Sazagan substation and a 500 kV overhead transmission line (200 km). The scope of work includes construction, electrical installation, and the installation of towers and wires.

See more projects in our presentation