  • Completed projects

Tashkent Co-generation Plant

The project aims to build modern facilities for the combined generation of electric and thermal energy in Tashkent. The project includes the installation of gas piston engines or gas turbine units (GTUs) with a total capacity of up to 100 MW to ensure efficient power supply to the city.

Toshkent Issiqlik Markazi Thermal Power Plant – Dismantling and restoration work

“Tashkent Heat Center” thermal power plant – the project located in Tashkent is aimed at modernizing the capacities of a gas thermal power plant. During the implementation process, demolition of old structures and restoration of infrastructure were carried out to ensure uninterrupted energy supply.

150 MW/300 MWh Battery Energy Storage System Project in Fergana | General Construction Works .

The BESS Uzbekistan project in Yapyan, Fergana region, Uzbekistan, is a significant step forward in energy efficiency. With a capacity of 150 MW/300 MWh, it optimizes the use of renewable energy, implements smart grid technologies, and helps engage the local community. Through stakeholder engagement, it sets a sustainable precedent for the region.

Andizhan Lochin 220 kV Substation Modernization Project

Talimarjon Thermal Power Plant (900 MW) in Kashkadarya: fabrication and installation of steel structures (3,068 tons), galvanized steel work, and material supply. The project is being subcontracted to Calık Enerji and Mitsubishi.

Andijan Lochin 150 MW/300 MWh Battery Energy Storage System Project

Talimarjon Thermal Power Plant (900 MW) in Kashkadarya: fabrication and installation of steel structures (3,068 tons), galvanized steel work, and material supply. The project is being subcontracted to Calık Enerji and Mitsubishi.

Talimarjon combined cycle thermal power plant with a capacity of 900 MW

Talimarjon Thermal Power Plant (900 MW) in Kashkadarya: concrete, installation, and formwork installation, as well as reinforcement fabrication and installation. The project is being subcontracted to Calık Enerji and Mitsubishi.

Construction of a 500 MW solar photovoltaic power plant in Kashkadarya

Construction of a 500 MW solar power plant in Kashkadarya: excavation and construction work, cable laying and installation, and panel installation. The project is being subcontracted to Energy China.

Construction of a 500 MW solar photovoltaic power plant in Bukhara

Construction of a 500 MW solar power plant in Bukhara: excavation and construction work, cabling, assembly, and installation of panels. The project is being subcontracted to Energy China.