UET Steel
UET Steel

UET STEEL

A modern industrial enterprise specializing in the anti-corrosion protection of metal structures for the infrastructure and industry of Uzbekistan.

Industrial basis for anti-corrosion protection

About the company

UET STEEL LLC is a modern industrial enterprise founded in 2025 with the goal of developing a sector critical to Uzbekistan’s infrastructure and industry. The company specializes in the processing of finished metal products with enhanced anti-corrosion properties using hot-dip galvanizing technology.

The company is focused on developing a local, world-class production facility capable of providing infrastructure and industrial projects with high-quality metal protection, extending the lifespan of facilities and reducing operating costs.

60,000 tons per year

Production capacity of the enterprise

2025 year of foundation

Modern production of the new generation

Full processing cycle

From the acceptance of metal structures to the shipment of finished products

Automated lines

Uniform and controlled hot-dip galvanizing

UET STEEL Services

  • All
  • Completed projects

Talimarjon Combined Cycle Thermal Power Plant with a Capacity of 900 MW (Steel Works)

Talimarjon Thermal Power Plant (900 MW) in Kashkadarya: fabrication and installation of steel structures (3,068 tons), galvanized steel work, and material supply. The project is being subcontracted to Calık Enerji and Mitsubishi.

UET INVEST Development Strategy

(2025–2030 гг.)

The strategic goal is to become a leader in the field of metal corrosion protection in Central Asia, providing the local market with world-class products, replacing imports, and promoting Uzbekistan’s technological independence.

To be a recognized leader in the metal protection industry, whose products are synonymous with reliability, quality, and durability in Uzbekistan and beyond.

Through the introduction of advanced technologies and expertise, we will make a significant contribution to Uzbekistan’s economic growth, providing domestic industry with high-quality products that extend the life of national assets.

Company Values
UET STEEL

Transparency and trust
Clear agreements and openness in relationships with clients and partners.
Responsible strategy
Priority to long-term sustainability, quality and environmental safety.
Synergy and expertise
Exchange of international experience for the continuous development of technologies and competencies.

Key events

Concluding long-term contracts with leading public and private companies in the energy, construction and transport sectors.
Power
up to 60,000 tons of metal processing per year.
Technologies
Implementation of automated hot-dip galvanizing lines.
Significance
A key national producer in import substitution programs.

Strategic goals

2026

  • Launch of the first production line, reaching design capacity.

2027–2028

  • Expand the customer base, obtain international certification, launch the second production line, and enter export markets.

2029–2030

  • Development of new product lines (galvanizing of large-diameter pipes)

News and media

President Visits Major Electrical Equipment Manufacturer in Yukorichirchik District

President Shavkat Mirziyoyev visited the NURA Electric plant in the Yukorichirchik district of Tashkent region, where he toured the production facilities and viewed an exhibition of finished products.

NURA Electric is a major manufacturer of high- and low-voltage electrical equipment, with a complete production cycle. Its operations help supply the energy sector with domestically manufactured products, reduce dependence on imports, and expand industrial cooperation.

The plant was built on a 20-hectare site with an investment of $50 million. It has created more than 1,000 jobs and established production of over 1,500 types of products, including 0.4–500 kV switchgear, substations, automation control cabinets for renewable energy systems, electrical busbars, and metal structures. The plant has an annual production capacity of more than 25,000 units of equipment.

The plant is equipped with modern technology, including digitally controlled machines and presses manufactured by Japan’s Amada, as well as advanced equipment from Turkish companies Durma and Teslabend. In total, the plant operates more than 120 units of such equipment.

Production and management processes are coordinated through an integrated SAP ERP digital platform. By optimizing operations and localizing the production of products and components, the company has reduced production costs by up to 10 percent.

The facility also operates an accredited testing laboratory. Its products are manufactured in accordance with international ISO standards. The enterprise is capable of organizing the complete assembly of equipment, conducting product testing in its own laboratory, and can provide round-the-clock maintenance services.

To train qualified engineering and technical personnel, the company has established cooperation with Uzenergoengineering JSC and Tashkent State Technical University. Every year, more than 100 university students complete paid industrial internships at the plant.

The President viewed an exhibition of the plant's finished products, featuring transformer substations, switchgear, and other power equipment manufactured using local raw materials and modern technologies.

He was also presented with information on the company's operations, production capacity, and plans for further development. During a conversation with the plant's employees, he asked about their working conditions and heard their opinions and suggestions.

The Head of State praised the company's production potential and product quality. He recommended expanding supplies to the domestic market, increasing exports to Central Asian countries and other foreign markets, and attracting highly qualified domestic specialists to the industry.

“We must export not only products but also engineering services. To achieve this, we need to make greater use of the potential of design organizations and testing laboratories being established in our country,” the President said.

President Shavkat Mirziyoyev also emphasized the need to expand the range and volume of spare parts and components produced, as well as the range of maintenance services offered.

He particularly stressed the importance of increasing localization in energy sector projects and instructed officials to increase the share of domestic design institutes in project development to at least 50 percent.

“We must trust domestic designers and create the necessary conditions for them. We have young specialists who have studied and gained experience abroad. By bringing qualified professionals together around them and providing them with orders, we can develop this industry,” the President emphasized.

To this end, regional branches of design institutes specializing in the energy sector will be established.

UET Construction at Samarkand Marathon 2026!

UET Construction proudly participated in Samarkand Marathon 2026, joining over 10,000 runners from 63 countries in a celebration of sport, unity, and determination.

 

Our colleagues took on the 10 km challenge, running through the historic streets of Samarkand and tackling demanding uphill climbs and downhill sections along the route.

Every kilometre required endurance, perseverance, and the determination to push beyond their limits.

They can truly be proud of themselves for this achievement, their dedication and willingness to take on the challenge!

A big thank you to everyone who represented UET Construction!

Proud of our you all. See you at the next marathons! 🧡

5 Million Safe Man-Hours – A Milestone of Commitment

UET Construction is proud to have achieved a significant milestone: 5 million work hours without a Lost Time Injury (LTI).

Behind this achievement are thousands of working days, strong safety discipline, professional teamwork, and the daily commitment of everyone across our projects.

This milestone reflects the collective efforts of our employees, engineers, site teams, management, subcontractors, and partners, whose commitment to HSE principles contributes to a safer working environment every day.

At UET Construction, safety is more than a performance indicator. It is a core value embedded in the way we plan, work, and make decisions.

Every safety briefing, site inspection, risk assessment, preventive action, and responsible decision has contributed to reaching this milestone. We sincerely thank everyone who has played a part in this achievement.

5,000,000 safe man-hours – one team, one commitment, one shared goal.
Our greatest achievement is ensuring that

UET Construction took part in the International Tashkent Marathon

UET Construction took part in the International Tashkent Marathon, reaffirming its commitment to the values of a healthy lifestyle and an active corporate culture.

For us, this is more than just a sporting event — it reflects our company’s philosophy: moving forward, resilience, and a strong drive for results. We support Ministry of Sports of the Republic of Uzbekistan, The National Olympic Committee of Uzbekistan and "PRORUN" Limited Liability Company initiatives that inspire growth, strengthen team spirit, and build a dynamic, energetic community.

UET Construction — building not only cities, but also a culture of a healthy future

President Visits Major Electrical Equipment Manufacturer in Yukorichirchik District

President Shavkat Mirziyoyev visited the NURA Electric plant in the Yukorichirchik district of Tashkent region, where he toured the production facilities and viewed an exhibition of finished products.

NURA Electric is a major manufacturer of high- and low-voltage electrical equipment, with a complete production cycle. Its operations help supply the energy sector with domestically manufactured products, reduce dependence on imports, and expand industrial cooperation.

The plant was built on a 20-hectare site with an investment of $50 million. It has created more than 1,000 jobs and established production of over 1,500 types of products, including 0.4–500 kV switchgear, substations, automation control cabinets for renewable energy systems, electrical busbars, and metal structures. The plant has an annual production capacity of more than 25,000 units of equipment.

The plant is equipped with modern technology, including digitally controlled machines and presses manufactured by Japan’s Amada, as well as advanced equipment from Turkish companies Durma and Teslabend. In total, the plant operates more than 120 units of such equipment.

Production and management processes are coordinated through an integrated SAP ERP digital platform. By optimizing operations and localizing the production of products and components, the company has reduced production costs by up to 10 percent.

The facility also operates an accredited testing laboratory. Its products are manufactured in accordance with international ISO standards. The enterprise is capable of organizing the complete assembly of equipment, conducting product testing in its own laboratory, and can provide round-the-clock maintenance services.

To train qualified engineering and technical personnel, the company has established cooperation with Uzenergoengineering JSC and Tashkent State Technical University. Every year, more than 100 university students complete paid industrial internships at the plant.

The President viewed an exhibition of the plant's finished products, featuring transformer substations, switchgear, and other power equipment manufactured using local raw materials and modern technologies.

He was also presented with information on the company's operations, production capacity, and plans for further development. During a conversation with the plant's employees, he asked about their working conditions and heard their opinions and suggestions.

The Head of State praised the company's production potential and product quality. He recommended expanding supplies to the domestic market, increasing exports to Central Asian countries and other foreign markets, and attracting highly qualified domestic specialists to the industry.

“We must export not only products but also engineering services. To achieve this, we need to make greater use of the potential of design organizations and testing laboratories being established in our country,” the President said.

President Shavkat Mirziyoyev also emphasized the need to expand the range and volume of spare parts and components produced, as well as the range of maintenance services offered.

He particularly stressed the importance of increasing localization in energy sector projects and instructed officials to increase the share of domestic design institutes in project development to at least 50 percent.

“We must trust domestic designers and create the necessary conditions for them. We have young specialists who have studied and gained experience abroad. By bringing qualified professionals together around them and providing them with orders, we can develop this industry,” the President emphasized.

To this end, regional branches of design institutes specializing in the energy sector will be established.

We are open to partnerships and long-term solutions.

Submit a request, and our team will contact you to discuss projects, partnerships, or additional information.