CHZMK
CHZMK

CHZMK

The Chirchik Metal Structures Plant (ChZMK) is a production facility that produces metal structures for energy, infrastructure, and industrial facilities in Uzbekistan.

Industrial potential within the UET Group

About the company

Chirchik Metal Structures Plant (ChMTZ/ChZMK) is one of the largest specialized enterprises for the production of lattice metal structures of any complexity and for a wide range of purposes, including transmission line supports with voltages up to 500 kV, antenna mast structures, antenna towers, drilling rigs, metal structures for buildings and structures, bridge structures, overpasses, and other types of products.

The plant boasts a robust production facility and modern equipment for processing rolled metal products. It manufactures metal structures of varying complexity, taking into account design options, drawings, and customer requirements. It allows for all types of connections (welded, bolted, and combined—prefabricated and disassemblable). It works in partnership with leading machine-building plants in the Republic of Uzbekistan, enabling it to solve complex engineering and technological challenges and produce metal structures of any configuration.

Manufactured structures meet fire resistance levels II–IV and, if necessary, can be coated with fire-retardant compounds in the factory or at the installation site. Control assemblies are performed at the plant to eliminate any potential inaccuracies. Quality assurance documents are provided for all products. Complete metal structure kits can be shipped by road and rail thanks to our own rail access.

7.2–10 thousand tons/year

metal processing capacity

up to 500 kV

production of metal structures for transmission line supports (range 35–500 kV)

0,5–200 мм

sheet metal cutting range (oxy-fuel/plasma)

Own railway tracks

shipment by road and rail

ChZMK services

  • All
  • Completed projects

Tashkent Co-generation Plant

The project aims to build modern facilities for the combined generation of electric and thermal energy in Tashkent. The project includes the installation of gas piston engines or gas turbine units (GTUs) with a total capacity of up to 100 MW to ensure efficient power supply to the city.

Toshkent Issiqlik Markazi Thermal Power Plant – Dismantling and restoration work

“Tashkent Heat Center” thermal power plant – the project located in Tashkent is aimed at modernizing the capacities of a gas thermal power plant. During the implementation process, demolition of old structures and restoration of infrastructure were carried out to ensure uninterrupted energy supply.

150MW/300MWh Battery Energy Storage System Project in Fergana, Uzbekistan | Electrical and Installation Works

The BESS Uzbekistan project is located in the city of Yapyan, Fergana region, and was successfully completed by the UET Construction company in late 2024 – early 2025. It provides stabilization of the energy network and management of peak loads in the Fergana Valley.

150 MW/300 MWh Battery Energy Storage System Project in Fergana | General Construction Works .

The BESS Uzbekistan project in Yapyan, Fergana region, Uzbekistan, is a significant step forward in energy efficiency. With a capacity of 150 MW/300 MWh, it optimizes the use of renewable energy, implements smart grid technologies, and helps engage the local community. Through stakeholder engagement, it sets a sustainable precedent for the region.

We are open to partnerships and long-term solutions.

Submit a request, and our team will contact you to discuss projects, partnerships, or additional information.